Our Project References
Showcasing our expertise and commitment to excellence in various engineering fields
List Project References
No | Date | Customer Name | Project Name | Description |
---|---|---|---|---|
1 | 04 Jan | PT. INDONESIA ORBIT KONSTRUKSI | PT. BQUIK OTOMOTIF INDONESIA (Palem Semi) | ME Work New Workshop |
2 | 05 Jan | J.O. SHIMIZU-BCK MPP PROJECT | MPP OFFICE BUILDING | Civil Works |
3 | 18 Jan | PT. KAJIMA INDONESIA | JKT3 NEW CONSTRUCTION PROJECT | Supply & Installation Sanitary Accessories |
4 | 03 Feb | PT. JX Nippon Oil & Energy Lubricants Indonesia | PT. JX Nippon Oil & Energy Lubricants Indonesia | Civil & ME Works for Logistic Center Project |
5 | 15 Feb | J.O. SHIMIZU - ADHI KARYA MRT-CP 201 PROJECT | Construction of Jakarta Mass Rapid Transit System Project | Electrical Works, Supply & Installation Power Supply medium voltage 20kV & 6.6kV, Supply & Installation Power supply low voltage 380/220V |
6 | 25 Feb | PT. Taisei Pulaiman Construction International | MFI New Office Project | Mechanical and Electrical Work |
7 | 05 Mar | J.O. SHIMIZU-BCK MPP PROJECT | MPP OFFICE BUILDING PROJECT | VO.2 Additional Work for Fire Pro Typical Floor |
8 | 06 Mar | PT. DNP INDONESIA | PT. DNP INDONESIA | Penggantian Trafo LVMDB ULP Kap : 630kva jadi 1000 Kva |
9 | 06 Apr | PT. AKASHI WAHANA INDONESIA | PT.AWI | Mechanical & Electrical Factory & Utilities Expansion Plant2 |
10 | 16 Apr | PRO-MATRIX PTE LTD | JKT 2 | Supply Rack PDU |
11 | 22 May | J.O. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-532 | Electrical Work Cable Tunnel, Batching Plant 3, Crushing Plant 3 |
12 | 31 May | J.O. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-532 | ME Works |
13 | 10 Jun | J.O. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-532 | Electrical Works, Supply & Installation Power Supply medium voltage 20kV & 6.6kV, Supply & Installation Power supply low voltage 380/220V, Supply & Installation over head line transmission 20kV |
14 | 18 Jun | PT. GE Operation Indonesia | PT. GE Operation Indonesia | Mechanical Works |
15 | 13 Jul | RYOWA DENKI JOINT OPERATION | IKEA STORE 2 (J4D1) | Civil Work |
16 | 30 Jul | J.O. SHIMIZU-ADHI KARYA MRT-CP 201 PROJECT | Construction of Jakarta Mass Rapid Transit System Project | Supply and installation of environment control system (ECS) in Main Stations and RSS of CP201 |
17 | 06 Aug | J.O. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-532 | Temporary Electrical Work for Crushing Plant 3 |
18 | 25 Sep | PT. MULIA RAYA AGRIJAYA | PT. MULIA RAYA AGRIJAYA | Preliminaries, Mekanikal, Elektrikal, Elektronik, HVAC |
19 | 22 Oct | PT DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Transformer (Dry Type) in Assembly Area |
20 | 10 Nov | PT DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Wiring Materials for MDB2 to each distribution board |
1 | 11 Jan | PT. INDONAKANO | SEID New Factory | Electrical Works |
2 | 12 Jan | PT. OE Operations Indonesia | MPP OFFICE Building | Paxton PMM081 - Induction Bolt Heating |
3 | 17 Jan | PT. INTI GANDA PERDANA | PT. INTI GANDA PERDANA | Instalasi ME Shaft Line Machining (Instalasi ME VNNJAIN-00061-AAA Shaft Line Machining IGP KIM |
4 | 18 Jan | PT. DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Material for K01 & K02 Power Supply |
5 | 31 Jan | PT. AKASHI WAHANA INDONESIA | PT. AWI | Additional Work mechanical electrical project plant 2 expansion |
6 | 08 Feb | PRO-MATRIX PTE LTD | JKT 2 | Mechanical Work & Electrical Work |
7 | 16 Feb | PT. TECHNO RYOWA ENGINEERING | ISEKI EXTENTION (P1210) | Electrical Work for Iseki Project |
8 | 28 Feb | PT. TECHNO RYOWA ENGINEERING | STEP (PT1903) | Mechanical Works for Step Phase 3, Mechanical Works, Overhead, Site Expansion |
9 | 04 Apr | PT. DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Material for K05, K06, K07, K08 & K09 Power Supply |
10 | 15 Apr | PT. SUKANDA DJAYA | PT. AWI | M/E NEW STP-WWT AWI PROJECT PLANT EXPANSION |
11 | 26 Apr | PT. KANSAI PRAKARSA COATINGS | PT. KANSAI PRAKARSA COATINGS | Pembuatan Canopy Drum Yard Unit Resin |
12 | 25 May | PT. INDONAKANO | Sankin Indonesia Minor | ME Works |
13 | 15 Jun | PT. SUKANDA DJAYA | PT. SUKANDA DJAYA PONTIANAK | Jasa Civil & ME Work Cab. Pontianak |
14 | 28 Jun | PT. TOSHIBA ASIA PACIFIC INDONESIA | Tanjung Jati | 2X 660MW Tanjung Jati B Coal Fired Power Plant Unit 1 & 2 Provision of High Frequency Induction Bolt Heater Rental Basis |
15 | 30 Jun | PT. Tirta Investama | Cianjur Plant | UU-UP-OLP-ME Work for Installation Air Compressor System |
16 | 11 Jul | J.O. SHIMIZU - ADHI KARYA MRT CP 202 PROJECT | Construction of Jakarta Mass Rapid Transit System Project (Phase 2) CP 202 | M&E Works at Site Office CP 202 |
17 | 30 Jul | PT. AQUA GOLDEN MISSISSIPPI | Aqua Sukabumi | Install ACP Windows container, additional install ACP |
18 | 03 Aug | PT. SUPERNOVA | PT. SUPERNOVA | M/E Pemindahan Mesin Digital Printing |
19 | 18 Aug | PT. NIHON HAKEN | PT. NIHON HAKEN | Pekerjaan Civil Works for Epoxy floor, ceramic, painting wall demolition & cleaning all area PT. Nihon Haken |
20 | 29 Aug | PT. AJINOMOTO INDONESIA | PT. Ajinomoto Indonesia (Mojokerto Factory) | Improve Box ground penangkali pet area EMP PTA |
1 | 31 Jan | RYOWA DENKI JOINT OPERATION | AKT 5 DATA CENTER (2/ID1) | AKT 5 Construction Service Labour Cost (Term 1 Period: 01 January 2023 - 15 January 2023) |
2 | 30 Jan | DNP INDONESIA | DNP Indonesia | Pengerjaan Bracket rak 3rd material lokal |
3 | 31 Jan | PT. JFE Steel Galvanizing Indonesia | PT. JFE Steel Galvanizing Indonesia | Electrical Work for Wiring Cable control wwt |
4 | 02 Feb | NSK BEARINGS MANUFACTURING INDONESIA | PT. NSK BEARINGS MANUFACTURING INDONESIA | Inst. Work Install Cable Dr. Dosing Pump |
5 | 03 Feb | PT. JFE Steel Galvanizing Indonesia | PT. JFE Steel Galvanizing Indonesia | ME Work Install Cable Dr. Dosing Pump |
6 | 06 Feb | DNP INDONESIA | DNP Indonesia | Pengerjaan Compressor 10x2 |
7 | 13 Feb | DENKO MANUFACTURING INDONESIA | IMRA Plant1 | Relayout and relayout assembly area into L10 LH4 |
8 | 15 Feb | RYOWA DENKI JOINT OPERATION | AKT 5 DATA CENTER (2/ID1) | KYTG Construction Service Labour Cost (Term 1 Period: 01 January 2023 - 15 January 2023) |
9 | 16 Feb | Tirta Investama | PT. Tirta Investama | ME Work for demolish & install new supply air duct |
10 | 19 Feb | SODEXO INDONESIA | Google Office | Routine Maintenance Work Drainage Work 1 & 2 PC (2/ID1) |
11 | 17 Feb | PT SODEXO INDONESIA | Google Office | Pemasangan Receptacle 220V Area kitchen dan toilet |
12 | 21 Feb | PT. ARAYA STEEL TUBE INDONESIA | PT. ARAYA STEEL TUBE INDONESIA | Installation Cable Control Panel |
13 | 23 Feb | PT. NSK BEARINGS MANUFACTURING INDONESIA | PT. NSK BEARINGS MANUFACTURING INDONESIA | Elec. Work for Relayout Cable Power supply compress |
14 | 25 Feb | PT SODEXO INDONESIA | Google Office | Pengerjaan Pipe Pompa Kitchen & Dishwasher Lvl-5 |
15 | 28 Feb | PT SODEXO INDONESIA | Google Office | Perbaikan Chiller M/K & Kitchen |
16 | 28 Feb | PROMATRIX PTE LTD | GTN Project | Temporary Cable for Elevator |
17 | 28 Feb | PT. DNP INDONESIA | DNP Indonesia | Electrical pemasangan mesin baru K/UM-PPC-4 |
18 | 28 Feb | PT SODEXO INDONESIA | Google Office | Perbaikan Filter Gustrapp Westafel Kitchen Lvl-5 |
19 | 28 Feb | PT. TECHNO RYOWA ENGINEERING | STANLAY(PT2107) | Electrical Works for Feeder Cable Factory Building 3 |
20 | 28 Feb | PT. TECHNO RYOWA ENGINEERING | EMBASSY GENERATOR (PT2123) | Electrical Works for Add Charge Cable Grounding |
21 | 02 Mar | PT. DENSO INDONESIA | Denso Bekasi Plant | Install depo point & air pipe at packing line -> bekasi plant |
22 | 02 Mar | PT. SODEXO INDONESIA | Google Office | Service maintenance work drainage 1 & 2 P/K |
23 | 03 Mar | PT. SODEXO SINERGI INDONESIA | Google Office | Maintenance Electrical |
24 | 03 Mar | DNP INDONESIA | DNP Indonesia | Pemasangan power AC Kantor Logistik |
25 | 06 Mar | RYOWA DENKI JOINT OPERATION | KT 1 DATA CENTER (ZT01) | KT01+ Construction Service Labor Cost (Term 01) Period: 06 Mar - 28 February 2024 |
26 | 09 Mar | PT. DENSO MANUFACTURING INDONESIA | DMA Plant | ME Works (modifikasi existing) |
27 | 13 Mar | PT. DENSO INDONESIA | Denso Fajar Plant | W/O Additional Ducting Spot Cooler Aisle Line 2 -> Fajar Plant |
28 | 14 Mar | PT. DENSO INDONESIA | Denso Bekasi Plant | Replacement Duct Due to Lifetime Stop -> Bekasi Plant |
29 | 15 Mar | PT. DENSO MANUFACTURING INDONESIA | DMA Plant | Electrical Work for Wiring Cable MC BF3 Manual |
30 | 18 Mar | PT. JEJAM INDONESIA | PT. MAPI | Making Semi clean room for electrical Room P2.6 (Add. Piston) |
Enso Cikarang
Fujita Kanko Isoras Cikarang