Our Maintenance Projects
Showcasing our expertise and commitment to excellence in maintenance services
List of Maintenance Projects
No | Date | Customer Name | Project Name | Description |
---|---|---|---|---|
1 | 17 Jan | PT. BENTOEL PRIMA | PT. BENTOEL PRIMA | Relocation Compressor & Vacuum |
2 | 30 Jan | PT. TECHNO RYOWA ENGINEERING | SAKURA RENOVATION (PT9502) | Mechanical & electrical work for new ware house |
3 | 14 Feb | PT. Denso Indonesia | Denso Fajar Plant | Mechanical and Electrical work of sparkplug final assy |
4 | 27 Mar | PT. INDONESIA POWER MAINTENANCE SERVICES UNIT | Bolt Heater DHF | Pengadaan alat High frequency bolt induction heater unit jasa pemeliharaan |
5 | 09 Apr | PT. TECHNO RYOWA ENGINEERING | SARI TAKAGI (PT0103) | Electrical Work for step project |
6 | 29 Apr | PT. BUMITANGERANG MESINDOTAMA | PT. BUMITANGERANG MESINDOTAMA | Installation for loading bay |
7 | 29 Apr | PT. AJINOMOTO INDONESIA | PT. Ajinomoto Indonesia (Mojokerto Factory) | Wiring Electric Power MV dan LV Panel HS Exp. PTA |
8 | 23 Jun | PRO-MATRIX PTE LTD | JKT 2 | Supply & installation of mechanical & electrical work |
9 | 08 Jul | JO SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-552 | Electrical Cable |
10 | 15 Jul | PRO-MATRIX PTE LTD | JKT 2 | Supply & installation of Vigilant, Perforated panel & access control |
11 | 31 Jul | PT. DENSO INDONESIA | Denso Fajar Plant | ME Work for Cooling tower step 2 north side |
12 | 10 Aug | PRO-MATRIX PTE LTD | JKT 2 | A100 Fiber Park Works installation conduit for A100 router fiber optic A100 duct basic work at A100 area, CAC-PVC Curtain-16-JKT-A100 |
13 | 18 Aug | PT. DENSO INDONESIA | Denso Fajar Plant | ME Work for Relayout 02 Sensor 4WW ~ Fajar Plant |
14 | 01 Sep | PT. TECHNO RYOWA ENGINEERING | SARI TAKAGI (PT0103) | Additional Mechanical & Electrical Works for Step Project |
15 | 07 Sep | PRO-MATRIX PTE LTD | JKT 2 LT-7 SHOP DAY 2 & 3 | Electrical Works - Supply & install 3Phase CEE Form Units Row 3 & 4, Overhead Cost, Site Expenses |
16 | 14 Sep | PT. INDONESIA ORBIT KONSTRUKSI | PT. BQUIK OTOMOTIF INDONESIA | ME Work Renovation workshop gading serpong |
17 | 29 Sep | RYOWA DENKI JOINT OPERATION | PATIMBAN | Civil Work Foundation Works |
18 | 26 Oct | PT. ARGHA KARYA PRIMA INDUSTRY Tbk | PT. ARGHA KARYA PRIMA INDUSTRY Tbk | Pekerjaan Renovasi Bangunan Gudang Ex Boiler dan Workshop Utility |
19 | 11 Nov | PT. BUMITANGERANG MESINDOTAMA | PT. BUMITANGERANG MESINDOTAMA | Jasa New Pipeline Brine Chiller & Chiller Mobilization |
20 | 13 Nov | RYOWA DENKI JOINT OPERATION | PATIMBAN | Electrical Work for ITSP STEP 1 |
1 | 04 Jan | PT. INDONESIA ORBIT KONSTRUKSI | PT. BQUIK OTOMOTIF INDONESIA (Palem Semi) | ME Work New Workshop |
2 | 05 Jan | J.O. SHIMIZU-BCK MPP PROJECT | MPP OFFICE BUILDING | Civil Works |
3 | 18 Jan | PT. KAJIMA INDONESIA | JKT3 NEW CONSTRUCTION PROJECT | Supply & Installation Sanitary Accessories |
4 | 03 Feb | PT. JX Nippon Oil & Energy Lubricants Indonesia | PT. JX Nippon Oil & Energy Lubricants Indonesia | Civil & ME Works for Logistic Center Project |
5 | 15 Feb | J.O. SHIMIZU - ADHI KARYA MRT-CP 201 PROJECT | Construction of Jakarta Mass Rapid Transit System Project | Electrical Works, Supply & Installation Power Supply medium voltage 20kV & 6.6kV, Supply & Installation Power supply low voltage 380/220V |
6 | 25 Feb | PT. Taisei Pulaiman Construction International | MFI New Office Project | Mechanical and Electrical Work |
7 | 05 Mar | J.O. SHIMIZU-BCK MPP PROJECT | MPP OFFICE BUILDING PROJECT | VO.2 Additional Work for Fire Pro Typical Floor |
8 | 08 Mar | PT. DNP INDONESIA | PT. DNP INDONESIA | Penggantian Trafo UMDB LT Kap : 630kVA jadi 1000 kVa |
9 | 08 Apr | PT. AKASHI WAHANA INDONESIA | PT.AWI | Mechanical & Electrical Factory & Utilities Expansion Plant2 |
10 | 16 Apr | PRO-MATRIX PTE LTD | JKT 2 | Supply Rack PDU |
11 | 22 May | JO. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-552 | Electrical Work Cable Tunnel, Batching Plant3, Crushing Plant 3 |
12 | 30 May | JO. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-552 | ME Works |
13 | 10 Jun | JO. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-552 | Electrical Works, Supply & Installation Power Supply medium voltage 20kV & 6.6kV, Supply & Installation Power supply low voltage 380/220V, Supply & Installation over head line transmission 20kV |
14 | 28 Jun | PT. GE Operation Indonesia | PT. GE Operation Indonesia | Mechanical Works |
15 | 13 Jul | RYOWA DENKI JOINT OPERATION | IKEA STORE 2 (1&DI) | Civil Work |
16 | 19 Jul | JO. SHIMIZU-ADHI KARYA MRT-CP 201 PROJECT | Construction of Jakarta Mass Rapid Transit System Project | Supply and installation of environment control system (ECS) in Monas station and RSS of CP201 |
17 | 06 Aug | JO. SHIMIZU-ADHI KARYA (ASAHAN PROJECT) | ASAHAN NO.3 HYDRO ELECTRIC POWER PLANT CONSTRUCTION PROJECT JICA LOAN NO.IP-552 | Temporary Electrical Work for Crushing Plant 3 |
18 | 25 Sep | PT. MULIA RAYA AGRIJAYA | PT. MULIA RAYA AGRIJAYA | Preliminaries, Mekanikal, Elektrikal, Elektronik, HVAC, ADD |
19 | 22 Oct | PT. DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Transformer (Dry Type) in Assembly Area |
20 | 10 Nov | PT. DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Wiring Materials for MDB2 to each distribution board |
1 | 11 Jan | PT. INDONAKANO | SEID New Factory | Electrical Works |
2 | 12 Jan | PT. GE Operations Indonesia | MPP OFFICE BUILDING | Patton PM0018 - Induction Bolt Heating |
3 | 17 Jan | PT. INTI GANDA PERDANA | PT. INTI GANDA PERDANA | Instalasi ME Shaft Line Mach (Instalasi ME WN/AIJN-00061-AAA Shaft Line Machining IGP KM) |
4 | 18 Jan | PT. DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Material for K01 & K02 Power Supply |
5 | 31 Jan | PT. AKASHI WAHANA INDONESIA | PT. AWI | Additional Work mechanical electrical project plant 2 expansion |
6 | 08 Feb | PRO-MATRIX PTE LTD | JKT 2 | Mechanical Work & Electrical Work |
7 | 18 Feb | PT. TECHNO RYOWA ENGINEERING | ISEKI EXTENTION (P71201) | Electrical Work for Iseki Project |
8 | 21 Feb | PT. TECHNO RYOWA ENGINEERING | STEP (PT1903) | Mechanical Works for Step Phase 3, Mechanical Works, Overhead, Site Expenses |
9 | 28 Feb | PT. DAIHATSU DRIVETRAIN MANUFACTURING INDONESIA | PT. DDMI | Material for K05, K06, K07, K08 & K09 Power Supply |
10 | 15 Apr | PT. SUKANDA DJAYA | PT. AWI | M/E New STP-WWT AWI PROJECT PLANT EXPANSION |
11 | 26 Apr | PT. KANSAI PRAKARSA COATINGS | PT. KANSAI PRAKARSA COATINGS | Pembuatan Canopy Drum Yard Unit Resin |
12 | 15 May | PT. INDONAKANO | Sankin Indonesia Minor | ME Works |
13 | 15 Jun | PT. SUKANDA DJAYA | PT. SUKANDA DJAYA PONTIANAK | Jasa Civil & ME Work Cab. Pontianak |
14 | 18 Jun | PT. TOSHIBA ASIA PACIFIC INDONESIA | Tanjung Jati | 2X 660MW Tanjung Jati B Coal Fired Power Plant Unit 1 & 2 Provision of High Frequency Induction Bolt Heater Rental Basis |
15 | 30 Jun | PT. Titra Investama | Cianjur Plant | UU-LP-OLP-ME Work for Installation Air Compressor System |
16 | 18 Jul | J.O. SHIMIZU - ADHI KARYA MRT-CP 202 PROJECT | Construction of Jakarta Mass Rapid Transit System Project (Phase 2) CP 202 | ME Works at Site Office CP 202 |
17 | 31 Jul | PT. AQUA GOLDEN MISSISSIPPI | Aqua Sukabumi | Install ACP Windows container, additional install ACP |
18 | 03 Aug | PT. SUPERNOVA | PT. SUPERNOVA | M/E Pemindahan Mesin Digital Printing |
19 | 18 Aug | PT. NIHON HAKEN | PT. NIHON HAKEN | Pekerjaan Civil Works for Epoxy floor, ceramic, painting wall, demolition & cleaning all area PT. Nihon Haken |
20 | 29 Aug | PT. AJINOMOTO INDONESIA | PT. Ajinomoto Indonesia (Mojokerto Factory) | Improve Box ground penangkal petir area EMP PTA |
Enso Cikarang
Fujita Kanko Isoras Cikarang